|
|
|
|
|
BUILDING CONSTRUCTION |
|
BRIDGE CONSTRUCTION |
|
ROAD CONSTRUCTION |
|
BOREHOLE DRILLING |
|
SOLAR POWERED ENERGY |
|
POWER PROJECT |
|
EROSION, DRAINAGE & FLOODING |
|
REAL ESTATE |
|
|
|
|
|
POWER PROJECTS |
|
OVERHEAD POWER TRANSMISSION
VIKNIRO VENTURES NIGERIA LIMITED has developed the competency to construct on
turnkey basis high voltage (33kV, 132kV, 220kV) overhead power transmission
lines.
SCOPE COVERED CONSISTED OF
Project Management
Designing of towers
Designing of Line Profile
Development of drawings &
documentation
Procurement of line components
Civil Construction
Tower erection
Stringing of conductors
Commissioning & Testing
The company has in-house competency in designing transmission line towers and
line profiles. The latest software is being used for this purpose to add value
to the customer by increasing the reliability of the power system.
We are able to conduct power audits and power requirement recommendations and we
are very confident that we will supply and commission power systems to your
utmost technical standards. Our after sales services offer are excellent, which
meet all our customer requirements.
VIKNIRO VENTURES NIGERIA LIMITED has proven her capability in executing diverse
and challenging projects on time to the maximum satisfaction of all clients
during the past 5 years since its inception in 2006.
The project executed by the company includes
High Voltage Power Transmission
Lines
Grid Substations
Underground High Voltage Power
Transmission Cable Networks.
Thermal and Hydro Power Plants
Telecommunication Towers
Electro Mechanical works for
water supply systems.
Latest technology in all
products solutions for all applications
A complete "one stop" clean
power solution for all your requirements
After Sales service and an
excellent support structure
Installations for all power
related projects
Power Audits & Site Design
VIKNIRO VENTURES NIGERIA LIMITED has the modern state of the art design
capabilities. Our talented, dynamic and dedicated staff enable us to provide a
professional and flexible approach to project management.
By introducing project managers with right expertise, supported through a
multi-skilled operations team, we have ensured that all projects are implemented
smoothly, whilst engineering and project management is coordinated cost
effectively and on time in every project undertaken by the company.
GRID SUBSTATION
VIKNIRO VENTURES NIGERIA LIMITED has been in the power substation construction
business for over 5years and have qualified personnel competent to handle the
construction and commissioning of primary and grid power substations ranging up
to 220kV.
VIKNIRO VENTURES NIGERIA LIMITED in its journey in power industry, has also
taken part in many Generation and Transmission switch yard development projects.
Equipment Used:
Omicron CPC 1000 Primary current
Injector
Omicron CPC 256 Tester
Circuit Breaker Analyzer
Syaytem-TM1800
Battery Discharge units-Torkel
840 with load unit TXL870
Battery impedance Teste-BITE3
Soaker
Fluke Digital millimeters &
Clipon meters
200A High current digital low
resist Ohm meters
Megger Earth Resistance tester
|
|
|
|
|